Hillcrest Roundabout (Design)
Eagle County has hired a professional engineering consultant to the design of the intersection of Highway 6 and Hillcrest Drive in West Edwards, Colorado. The project will redesign the current T intersection into a roundabout. Project is currently in the right of way acquisition stage with construction anticipated to take place Fall 2023 or Spring 2024.
Highway 131 & Ute Creek Road Intersection (Design)
Eagle County has hired a professional engineering consultant to the design of the intersection of Highway 131 and Ute Creek Road in Eagle County, Colorado. The project will require at least 2 intersection design alternatives, to include necessary turn lanes and roundabout alternatives, the preferred alternative to be selected by the project team composed of Eagle County staff and various stakeholders. Final plans are anticipated to be completed by December 2023.
El Jebel Intersection Upgrade (Design)
Eagle County has hired a professional engineering consultant to the design and reconfigure Jebel Road and Valley Road intersection in El Jebel, Colorado. The project will redesign the intersection to provide for more stacking distance for the south leg of the El Jebel intersection. Final plans are anticipated to be completed by January 2024.
Daggett Lane Bridge
Eagle County Engineering and Road Bridge departments will be replacing the Daggett Lane Bridge over the Gypsum Creek in the summer of 2023. The bridge needed replacement because the bridge is classified as structurally deficient.
PAST PROJECTS
Gypsum Creek Bridge
Eagle County Engineering and Road Bridge departments replaced the Gypsum Creek Bridge in the summer of 2022. The bridge needed replacement because the bridge was classified as structurally deficient.
I-70G Edwards Interchange Upgrade Project Phase 2 (Edwards Spur Road)
Eagle County and the Colorado Department of Transportation are collaborating on the design of phase II of the I-70 Edwards Interchange Upgrade Project in Edwards. The project encompasses roadway improvements along the Edwards Spur Road from Miller Ranch Road to U.S. Hwy 6, including the intersection. Construction began in February of 2019 and was completed in September of 2020.