About the Project
This project will reconfigure the existing "T" intersection between Highway 6 an Hillcrest Drive into a single lane roundabout.
Construction will take place under traffic.
Travelers are reminded to slow down, stay alert, and drive distraction free while traveling through the project limits.
The project will improve safety for vehicles, bicycles, and pedestrians.
This project aims to protect the health, safety, and welfare of the residents of Eagle County.
This project is funded by Eagle County and the Edwards Metro District.
Traffic Impacts
Speeds will be reduced from normal speeds to 30 mph to 20 mph through the project limits during construction.
Travel lane widths will be reduced to 11 feet through the project limits during construction.
Below is the first phase for handling traffic.
Per the Colorado Department of Transportation Lane Closure Strategy, the contractor is allowed lane closures down to a single lane with flaggers provided that the delay to the traveling public is no greater than 15 minutes for the following times for the following dates:
Work Schedule
Construction is began on April 1, 2024
Construction is scheduled to be completed October 29, 2024
Working Hours: 7:00 am - 7:00 pm
The following is a link to the entire Project Schedule
20240410 - Hillcrest Project Baseline Schedule
The following is a link to a detailed 4 Week Look Ahead Schedule
20240513 - Hillcrest Schedule - 4 Week Look Ahead
Project Facts
Construction Cost: $4,383,539.85
Contractor: Gould Construction, Inc.
Consultant Inspector: SGM
Timeline: April through October 2024
Location: Highway 6 and Hillcrest Drive in West Edwards
Contact
Project Hotline: 970.328.3567
Project Email: richard.davies@eaglecounty.us
Add your email address to our weekly email distribution list for updates on the Hillcrest Roundabout construction:
Email Engineering
Weekly Updates
20240520 Hillcrest Roundabout - Weekly Project Email Update
20240520 Hillcrest Roundabout - Weekly Project Email Update _Spanish
This project will reconfigure the existing "T" intersection between Highway 6 an Hillcrest Drive into a single lane roundabout.
Construction will take place under traffic.
Travelers are reminded to slow down, stay alert, and drive distraction free while traveling through the project limits.
The project will improve safety for vehicles, bicycles, and pedestrians.
This project aims to protect the health, safety, and welfare of the residents of Eagle County.
This project is funded by Eagle County and the Edwards Metro District.
Traffic Impacts
Speeds will be reduced from normal speeds to 30 mph to 20 mph through the project limits during construction.
Travel lane widths will be reduced to 11 feet through the project limits during construction.
Below is the first phase for handling traffic.
Per the Colorado Department of Transportation Lane Closure Strategy, the contractor is allowed lane closures down to a single lane with flaggers provided that the delay to the traveling public is no greater than 15 minutes for the following times for the following dates:
- May 16 to September 15: Closures are allowed between 9:00 am - 2:00 pm and 6:00 pm - 7:00 pm
- September 16 to September 30: Closures are allowed between 9:00 am - 2:00 pm and 5:00 pm - 7:00 pm
Work Schedule
Construction is began on April 1, 2024
Construction is scheduled to be completed October 29, 2024
Working Hours: 7:00 am - 7:00 pm
The following is a link to the entire Project Schedule
20240410 - Hillcrest Project Baseline Schedule
The following is a link to a detailed 4 Week Look Ahead Schedule
20240513 - Hillcrest Schedule - 4 Week Look Ahead
Project Facts
Construction Cost: $4,383,539.85
Contractor: Gould Construction, Inc.
Consultant Inspector: SGM
Timeline: April through October 2024
Location: Highway 6 and Hillcrest Drive in West Edwards
Contact
Project Hotline: 970.328.3567
Project Email: richard.davies@eaglecounty.us
Add your email address to our weekly email distribution list for updates on the Hillcrest Roundabout construction:
Email Engineering
Weekly Updates
20240520 Hillcrest Roundabout - Weekly Project Email Update
20240520 Hillcrest Roundabout - Weekly Project Email Update _Spanish