Overview

I-70G Edwards Interchange Upgrade Project Phase 2 (Edwards Spur Rd): Eagle County and the Colorado Department of Transportation are collaborating on the design of phase II of the I-70 Edwards Interchange Upgrade Project in Edwards. The project encompasses roadway improvements along the Edwards Spur Road from Miller Ranch Road to U.S. Hwy 6, including the intersection. The project is scheduled to start construction in February of 2019.

Artist Rendering for Website

Current Design

Tentative Construction Schedule

El Jebel Roundabout: Engineering received a Colorado Department of Transportation Hazard Elimination Grant for improvements to the El Jebel Road Intersection. The roundabout is located at Highway 82 and El Jebel Road in El Jebel. Construction began in April of 2017 and was completed in September 2017.

El Jebel Roundabout

Red Dirt Bridge Replacement:  Engineering received a Federal Land Access Program grant for replacement of the Red Dirt Bridge (EAG 301-15.6). The Bridge is located 15.6 miles northeast of Dotsero on the Colorado River Road and crosses over the Colorado River. Construction began in July, 2016 and was completed in May 2017.

IMG-0924

Burns Bridge Replacement:  Engineering received a Federal Off-System Bridge Replacement Grant for the replacement of the Burns Bridge (EAG 301-23.5). The Bridge is located 23.5 miles northeast of Dotsero on the Colorado River Road and crosses over the Colorado River. Construction was completed in September 2016.

Burns Bridge

Catamount Bridge Replacement: Engineering received a Federal Off-System Bridge Replacement Grant for the replacement of the Catamount Bridge (EAG 301-27.7). The Bridge is located 27.7 miles northeast of Dotsero on the Colorado River Road and crosses over the Colorado River. Construction was completed in September 2016.