Engineering

Contact Us

  • Phone: 970-328-3560
    Fax: 970-328-8789

    Engineering
    P.O. Box 850
    Eagle, Colorado 81631 

    engineering@eaglecounty.us 


Edwards Spur Road project approaches major roundabout construction

News from the Colorado Department of Transportation

Contact: Tracy Trulove, CDOT Communications Office Western Slope, 970-384-3371, tracy.trulove@state.co.us

June 10, 2019 – Beginning 8 p.m. on Wednesday, June 12, crews with the Edwards Spur Road project will transition the intersection of Edwards Access Road and U.S. Highway 6 into a new alignment to begin the first half of the new roundabout construction. The work to reconfigure the intersection into its new traffic alignment is expected to be complete by 6 a.m. on Thursday, June 13.

To facilitate the traffic transition, Edwards Access Road will be closed north of the intersection from 8 p.m. to 6 a.m. During this closure, businesses and residences will remain accessible, but motorists may need to use the detour route to reach their destinations. North and southbound through traffic on Edwards Access Road will use Miller Ranch Road and U.S. Highway 6 as the detour. Motorists should expect delays through the project area during this time.

Once the new alignment is in place, temporary traffic signals will direct motorists through the intersection during roundabout construction. Crews will maintain two lanes of travel in all directions — one dedicated left-turn lane and another lane for through- and right-turn traffic.

Many design features of the Edwards Spur Road project support CDOT’s Whole System — Whole Safety systematic approach to traffic safety. Roundabouts have been proven safer and more efficient than traditional intersections and help reduce the number of serious crashes. Additionally, roundabouts are designed to improve safety for all road users, including pedestrians and bicycles.

The first half of the roundabout construction will occur in June and July. Once complete, construction will move to the other side of road for the second half of the roundabout construction. Both phases are expected to be complete by the end of August.

The roundabout construction will require temporary closures of the Highway 6 at Edwards Spur Road West and Highway 6 at Riverwalk East ECO Transit bus stops. Bus users can use the nearby Highway 6 at Riverwalk West and Highway 6 at Edwards Spur Road East as alternate stops, respectively.

Pedestrian routes will also change during roundabout construction with detour signage directing them through the intersection.

Remember: Slow for the Cone Zone
The following tips are to help you stay safe while traveling through maintenance and construction work zones.
● Do not speed in work zones. Obey the posted speed limits.
● Stay Alert! Expect the unexpected.
● Watch for workers. Drive with caution.
● Don't change lanes unnecessarily.
● Avoid using mobile devices such as phones while driving in work zones.
● Turn on headlights so that workers and other drivers can see you.
● Be especially alert at night while driving in work zones.
● Expect delays, especially during peak travel times.
● Allow ample space between you and the car in front of you.
● Anticipate lane shifts and merge when directed to do so.
● Be patient.