Overview

El Jebel Roundabout: Engineering received a Colorado Department of Transportation Hazard Elimination Grant for improvements to the El Jebel Road Intersection.  This project will replace the intersection of El Jebel Road and Shadowrock Drive with a roundabout.  Construction is anticipated to commence in April of 2017 and will be completed in November of 2017.

The existing conditions are shown below.

Project Overview - Existing - Resized2

The proposed design is shown below.

Project Overview - Proposed - Resized2

I-70G Edwards Interchange Upgrade Project Phase 2 (Edwards Spur Rd):  Eagle County and the Colorado Department of Transportation (CDOT) are collaborating on the design of phase II of the I-70 Edwards Interchange Upgrade Project in Edwards. The project encompasses roadway improvements along the Edwards Spur Road from Miller Ranch Road to U.S. Hwy 6, including the intersection. The project is in the design stage.

Artist Rendering for Website

Red Dirt Bridge Replacement:  Engineering received a Federal Land Access Program grant for replacement of the Red Dirt Bridge (EAG 301-15.6).  The Bridge is located 15.6 miles northeast of Dotsero on the Colorado River Road and crosses over the Colorado River.  Construction began in July, 2016 and was completed in May, 2017.

IMG-0924

Burns Bridge Replacement:  Engineering received a Federal Off-System Bridge Replacement Grant for the replacement of the Burns Bridge (EAG 301-23.5).   The Bridge is located 23.5 miles northeast of Dotsero on the Colorado River Road and crosses over the Colorado River.  Construction was completed in September, 2016.

Burns Bridge

Catamount Bridge Replacement: Engineering received a Federal Off-System Bridge Replacement Grant for the replacement of the Catamount Bridge (EAG 301-27.7).  The Bridge is located 27.7 miles northeast of Dotsero on the Colorado River Road and crosses over the Colorado River.  Construction was completed in September, 2016.

Catamount Bridge